A DOB sign-off is the final approval issued by the New York City Department of Buildings (DOB) to confirm that all work on a construction or renovation project has been completed according to code and that all inspections and required documents have been properly submitted. This is the last step in closing out a building permit.
Why Is a DOB Sign-Off Important?
Without a DOB sign-off:
The permit remains open, which can affect property sales, refinancing, or certificate of occupancy (CO) issuance.
The project is considered incomplete or non-compliant.
You may incur penalties or violations for unfinished or unverified work.
Types of Sign-Offs
Final Construction Sign-Off – For general construction work.
Plumbing Sign-Off – Confirms plumbing work was inspected and approved.
Electrical Sign-Off – Issued by a licensed electrician through a separate process with the DOB Electrical Division.
Fire Department (FDNY) Sign-Off – Required for sprinkler or fire alarm systems.
Special Inspections Sign-Offs – Includes structural, energy code compliance, etc.
Steps to Obtain a DOB Sign-Off
Complete the Work as per approved plans.
Schedule and Pass Required Inspections (e.g., construction, plumbing, elevator, etc.).
Submit All Necessary Documents:
TR1: Technical Report Statement of Responsibility
TR8: Energy Code Compliance
Final inspection reports
Close All Open Applications & Permits.
Submit Final Sign-Off Request through DOB NOW or BIS (depending on the filing system).
Who Can Request It?
Licensed Contractors
Registered Architects/Engineers
Property Owners (with proper authorization)
How to Check Sign-Off Status
You can check a project’s sign-off status using:
DOB NOW: https://www.nyc.gov/dobnow
BIS (Building Information System): https://a810-bisweb.nyc.gov
Search by address, permit number, or job number.
Common Reasons for Delayed Sign-Off
Missing inspections or failed inspections
Open violations (e.g., ECB, HPD)
Incomplete or inaccurate documentation
Outstanding fees or unpaid penalties
To avoid complications, work with a licensed expeditor, contractor, or architect experienced in DOB processes. They can ensure all steps are completed properly and your project is signed off without delay.